North Korean building work at nuclear site is advancing, IAEA says

IAEA chief says continuation of the nuclear programme is a ‘clear violation’ of UNSC resolutions

Maroosha Muzaffar
Monday 06 June 2022 13:25 BST
Comments
Jake Sullivan warns of potential North Korean weapons test.mp4

Your support helps us to tell the story

From reproductive rights to climate change to Big Tech, The Independent is on the ground when the story is developing. Whether it's investigating the financials of Elon Musk's pro-Trump PAC or producing our latest documentary, 'The A Word', which shines a light on the American women fighting for reproductive rights, we know how important it is to parse out the facts from the messaging.

At such a critical moment in US history, we need reporters on the ground. Your donation allows us to keep sending journalists to speak to both sides of the story.

The Independent is trusted by Americans across the entire political spectrum. And unlike many other quality news outlets, we choose not to lock Americans out of our reporting and analysis with paywalls. We believe quality journalism should be available to everyone, paid for by those who can afford it.

Your support makes all the difference.

International Atomic Energy Agency chief Rafael Mariano Grossi has said that North Korea is advancing on building work that will expand key facilities at its main Yongbyon nuclear site.

Mr Grossi told a quarterly meeting of the agency’s 35-nation board of governors on Monday that “a roof has been installed on the annex to the reported Centrifuge Enrichment Facility, so the annex is now externally complete”, according to Reuters.

He noted in a statement to the board that “near the light water reactor (LWR), we have observed that the new building that had been under construction since April 2021 has been completed, and construction has started on two adjacent buildings.”

He added: “At the Nuclear Test Site at Punggye-ri we have observed indications that one of the adits [horizontal passages] has been reopened, possibly in preparation for a nuclear test. The conduct of a nuclear test would contravene UN Security Council resolutions and would be a cause for serious concern.”

Mr Grossi told the board that “at the Yongbyon site, activities are continuing. There are ongoing indications consistent with the operation of the 5MW(e) reactor. There are indications of activity at the Radiochemical Laboratory that are consistent with those observed during possible waste treatment or maintenance activities in the past.”

He also pointed out that the 50MW(e) reactor, the construction of which had stopped in 1994, the “dismantling of buildings and the removal of some material, likely for re-use in other construction projects” was observed.

“There are ongoing indications of activities at the Kangson complex and the Pyongsan Mine and Concentration Plant,” the IAEA chief said.

He reiterated that the continuation of North Korea’s nuclear programme “is a clear violation of relevant UN Security Council resolutions and is deeply regrettable”.

“I call upon the DPRK to comply fully with its obligations under relevant UN Security Council resolutions, to cooperate promptly with the Agency in the full and effective implementation of its NPT Safeguards Agreement and to resolve all outstanding issues, especially those that have arisen during the absence of Agency inspectors from the country,” he added.

Mr Grossi’s statement comes in the wake of IAEA’s report last month that said North Korea had restarted a plutonium-producing reactor at its primary Yongbyon nuclear complex to the highest levels in three years.

Join our commenting forum

Join thought-provoking conversations, follow other Independent readers and see their replies

Comments

Thank you for registering

Please refresh the page or navigate to another page on the site to be automatically logged inPlease refresh your browser to be logged in