Stay up to date with notifications from The Independent

Notifications can be managed in browser preferences.

Rush-hour chaos at London Victoria station after train derails

An engineering train derailed in the early hours, closing access to five key platforms

Simon Calder
Travel Correspondent
Tuesday 09 July 2019 14:22 BST
Comments
Rush-hour chaos at London Victoria station after train derails

Your support helps us to tell the story

From reproductive rights to climate change to Big Tech, The Independent is on the ground when the story is developing. Whether it's investigating the financials of Elon Musk's pro-Trump PAC or producing our latest documentary, 'The A Word', which shines a light on the American women fighting for reproductive rights, we know how important it is to parse out the facts from the messaging.

At such a critical moment in US history, we need reporters on the ground. Your donation allows us to keep sending journalists to speak to both sides of the story.

The Independent is trusted by Americans across the entire political spectrum. And unlike many other quality news outlets, we choose not to lock Americans out of our reporting and analysis with paywalls. We believe quality journalism should be available to everyone, paid for by those who can afford it.

Your support makes all the difference.

Tens of thousands of commuters using Britain’s second-busiest railway station have faced severe disruption after another delay involving a derailment.

A Network Rail engineering train being used overnight at London Victoria left the rails at 3am, blocking five of the most heavily used platforms at the terminus: platforms 9 to 13.

In addition, the normal slow line between Victoria and Clapham Junction – Britain’s busiest interchange – is closed.

The shutdown caused havoc in the morning rush hour, and disruption is expected until the end of the day.

Close to a quarter-million travellers use the terminus on a typical working day – including thousands of passengers heading to or from Gatwick airport.

The Gatwick Express has stopped running, and many services operated by Southern have been cancelled or heavily delayed.

Almost all services calling at the Sussex airport have been suspended.

Even when the train is re-railed and removed, repairs to track damage will be required.

National Rail said: “There will be a severely reduced and disrupted service to and from London Victoria.

“Train services running to and from this station may be cancelled, delayed or diverted via London Bridge.

“Passengers requiring London are advised to travel to London Bridge or London Blackfriars as an alternative to London Victoria.

“Expect some delays to services travelling towards London Bridge/London Blackfriars as these services will be used to call additionally at certain stations to ease service gaps.”

Passengers using four stations – Epsom Downs, Banstead, Belmont and Battersea Park – have been told to use bus services instead as no trains will call.

Support free-thinking journalism and attend Independent events

Ticket acceptance has been negotiated so that passengers with Southern and Gatwick Express tickets can use Thameslink services via London Bridge and Blackfriars.

Commuters who managed to reach London faced additional problems, with the closure of the Northern Line at the height of the rush hour due to a signal failure. After the morning peak, the Charing Cross branch re-opened.

London Underground said: “No service between Camden Town and Kennington southbound via Bank. Minor delays on the rest of the line while we fix a signal failure at Kennington.”​

Join our commenting forum

Join thought-provoking conversations, follow other Independent readers and see their replies

Comments

Thank you for registering

Please refresh the page or navigate to another page on the site to be automatically logged inPlease refresh your browser to be logged in