New London Underground train vandalised with graffiti before even making it into service
A test train for the new Piccadilly fleet was vandalised as it arrived in London
Your support helps us to tell the story
From reproductive rights to climate change to Big Tech, The Independent is on the ground when the story is developing. Whether it's investigating the financials of Elon Musk's pro-Trump PAC or producing our latest documentary, 'The A Word', which shines a light on the American women fighting for reproductive rights, we know how important it is to parse out the facts from the messaging.
At such a critical moment in US history, we need reporters on the ground. Your donation allows us to keep sending journalists to speak to both sides of the story.
The Independent is trusted by Americans across the entire political spectrum. And unlike many other quality news outlets, we choose not to lock Americans out of our reporting and analysis with paywalls. We believe quality journalism should be available to everyone, paid for by those who can afford it.
Your support makes all the difference.A new London Underground test train has been vandalised after it arrived in London for its trial runs on the Piccadilly Line.
The test train, complete with the modern features set to be introduced onto the line next year, had only arrived in the UK hours earlier from a factory in Germany when graffiti was sprayed along the sides of the carriages.
British Transport Police said that it received reports at around 6.45am Monday (14 October) of criminal damage to several train carriages, adding that enquiries are ongoing.
Transport for London (TfL) said that the first of its new underground train fleet arrived in London on Monday, but has since been cleaned and driven to its depot.
The new trains will enter service on the Piccadilly line by the end of 2025, with the full fleet of 94 trains expected to be completely rolled out by the end of 2027.
The train took a 400-mile journey, pulled by another locomotive from its test track in Wildenrath, Germany, to London through the Channel Tunnel.
The train will undergo a period of testing overnight out of operating hours and during some planned closures, as well as in between gaps of normal services, to ensure it’s compatible with the Piccadilly line.
While the test train was built in Germany, around 80 per cent of the new trains will be produced at Siemens Mobility’s new factory in East Yorkshire.
The new trains will feature walk-through carriages, wider doorways, information screens, CCTV cameras and air-conditioning – a first for deep tube trains.
TfL hopes that the trains will be more energy efficient, consuming 20 per cent less energy than the existing fleet.
The new trains are part of a £2.9bn programme modernising the underground, which is predicted to boost journey times, train frequency and reliability.
The British Transport Police asks anyone with information on the vandalism to contact BTP by texting 61016, quoting reference ‘75 of 14 October’.
For more travel news and advice, listen to Simon Calder’s podcast
Join our commenting forum
Join thought-provoking conversations, follow other Independent readers and see their replies
Comments