Stay up to date with notifications from The Independent

Notifications can be managed in browser preferences.

King's Cross delays: Rail passengers face disruption by weekend engineering work

Partial closure at London King's Cross is in preparation for complete shutdown over the August Bank Holiday

Simon Calder
Travel Correspondent
Friday 12 July 2019 15:48 BST
Comments
King's Cross engineering work begins

Your support helps us to tell the story

From reproductive rights to climate change to Big Tech, The Independent is on the ground when the story is developing. Whether it's investigating the financials of Elon Musk's pro-Trump PAC or producing our latest documentary, 'The A Word', which shines a light on the American women fighting for reproductive rights, we know how important it is to parse out the facts from the messaging.

At such a critical moment in US history, we need reporters on the ground. Your donation allows us to keep sending journalists to speak to both sides of the story.

The Independent is trusted by Americans across the entire political spectrum. And unlike many other quality news outlets, we choose not to lock Americans out of our reporting and analysis with paywalls. We believe quality journalism should be available to everyone, paid for by those who can afford it.

Your support makes all the difference.

Rail passengers using one of the 10 busiest stations in Britain face disruption this weekend because of large-scale engineering work.

Seven of the 12 platforms at London King’s Cross will be closed as Network Rail staff remove old signalling equipment from a disused railway tunnel just outside the station.

The work is in preparation for laying new track over the August Bank Holiday – which is traditionally the time for widespread closures and cancellations.

King’s Cross is the capital’s hub for the East Coast main line, running to Yorkshire, northeast England and Scotland.

It also serves Cambridge, King’s Lynn and Lincoln.

All the train operators using King’s Cross are cutting back their services.

LNER, the main operator, and Hull Trains, are both cancelling early services. The first northbound departures will be at around 9am on Saturday and 10.45am on Sunday.

“Throughout Saturday and Sunday, LNER will operate a maximum of four trains per hour to and from London King’s Cross,” said the train operator.

Of trains that do run, northbound services will depart King’s Cross five minutes earlier than normal and regain their normal timings from Stevenage.

Some LNER trains will start from or terminate at Peterborough.

Grand Central warns: “Trains are expected to be very busy over the weekend and customers are advised not to travel without a seat reservation.

Great Northern trains to Cambridge, King’s Lynn and Peterborough trains will start from, and terminate at, Finsbury Park – the first station north from London Kings Cross, and with a Tube option on the Victoria Line.

On Sunday, some direct trains on Thameslink from Gatwick airport to Cambridge will be cut.

Looking ahead to the August Bank Holiday, passengers are being advised not to travel on the line due to the scale of the work. Major work is taking place between Peterborough and King’s Cross, as well as track renewal in the Newark area.

Support free-thinking journalism and attend Independent events

LNER is urging passengers not to travel to London after Friday afternoon, 23 August, and before Tuesday 27 August.

Even on the West Coast main line, many Advance tickets are unavailable on Virgin Trains over the Bank Holiday because of the expected switch from the East Coast main line.

Network Rail says: “The project is set to provide a once-in-a-generation opportunity to improve this vital part of the rail network, which carries trains bound for as far afield as northern Scotland, as well as many commuter services across the South East, and prepare the infrastructure for the future.”

Join our commenting forum

Join thought-provoking conversations, follow other Independent readers and see their replies

Comments

Thank you for registering

Please refresh the page or navigate to another page on the site to be automatically logged inPlease refresh your browser to be logged in