Minister hails ‘extraordinary’ HS2 bridge
Huw Merriman visited the site where HS2’s 2.1-mile-long Colne Valley Viaduct is being built just outside north-west London.
Your support helps us to tell the story
This election is still a dead heat, according to most polls. In a fight with such wafer-thin margins, we need reporters on the ground talking to the people Trump and Harris are courting. Your support allows us to keep sending journalists to the story.
The Independent is trusted by 27 million Americans from across the entire political spectrum every month. Unlike many other quality news outlets, we choose not to lock you out of our reporting and analysis with paywalls. But quality journalism must still be paid for.
Help us keep bring these critical stories to light. Your support makes all the difference.
HS2 minister Huw Merriman hailed the “extraordinary feat of engineering and architecture” as he inspected construction of what will be the UK’s longest railway bridge.
Mr Merriman visited the site where HS2’s 2.1-mile-long (3.4km) Colne Valley Viaduct is being built to carry high-speed trains above a series of lakes and waterways just outside north-west London.
Construction began in May last year, and the first 480 metres of the structure have been built.
A 160-metre-long machine known as a launching girder is being used to lift into position 1,000 giant concrete segments that form the viaduct’s arches.
The segments each weigh up to 140 tonnes and are being made at a temporary factory nearby which was built specifically for the project.
Mr Merriman said: “This is an extraordinary feat of engineering and architecture, designed to enable spectacular views across a beautiful part of our British countryside which is being preserved and protected by this project.
“It was incredible to be the first person to officially walk on top of it today – another milestone for this monumental project which will transform journeys for people up and down the country, creating almost 30,000 jobs and providing a low-carbon alternative to cars for decades to come.”
HS2 Ltd project client David Emms said: “After seven months of hard work, it’s great to finally be able to walk on part of the Colne Valley Viaduct.
“Once complete, this record-breaking structure will form a key part of the HS2 route – helping to deliver better connections across the UK, free up rail capacity on the existing train network, and offer passengers zero-carbon travel options.
“I’d like to thank all those involved in getting us to this exciting stage and look forward to seeing the whole viaduct come together over the coming years.”
The viaduct is expected to be completed by summer 2025.
The launching girder is the only machine of its kind in the UK.
It was built in 2004, and was first used in Hong Kong.
Designers of the viaduct were tasked with minimising its impact on the environment.
It is being set low into the landscape, taking inspiration from the flight of a stone skipping across water.
The work is part of a £1.6 billion contract handed to joint venture Align, which also involves building a 10-mile-long (16km) tunnel under the Chiltern Hills.
Subscribe to Independent Premium to bookmark this article
Want to bookmark your favourite articles and stories to read or reference later? Start your Independent Premium subscription today.