Stay up to date with notifications from The Independent

Notifications can be managed in browser preferences.

Ministers to provide third of Hammersmith Bridge stabilisation costs

The money will help ensure the 134-year-old cast-iron structure remains open for pedestrians, cyclists and river traffic.

Neil Lancefield
Tuesday 22 March 2022 11:09 GMT
One-third of the cost of stabilising west London’s Hammersmith Bridge will be met by the Government (Adam Davy/PA)
One-third of the cost of stabilising west London’s Hammersmith Bridge will be met by the Government (Adam Davy/PA) (PA Archive)

Your support helps us to tell the story

From reproductive rights to climate change to Big Tech, The Independent is on the ground when the story is developing. Whether it's investigating the financials of Elon Musk's pro-Trump PAC or producing our latest documentary, 'The A Word', which shines a light on the American women fighting for reproductive rights, we know how important it is to parse out the facts from the messaging.

At such a critical moment in US history, we need reporters on the ground. Your donation allows us to keep sending journalists to speak to both sides of the story.

The Independent is trusted by Americans across the entire political spectrum. And unlike many other quality news outlets, we choose not to lock Americans out of our reporting and analysis with paywalls. We believe quality journalism should be available to everyone, paid for by those who can afford it.

Your support makes all the difference.

One-third of the cost of stabilising west London’s Hammersmith Bridge will be met by the Government.

Ministers announced funding of £2.93 million to ensure the crossing remains open for pedestrians, cyclists and river traffic.

Cracks in the pedestals of the 135-year-old cast-iron structure mean motor vehicles have been banned from using it since April 2019.

This has increased journey times and congestion as it forces people to take alternative routes across the Thames.

The bridge was closed to all users in August 2020 after the cracks deteriorated during a heatwave.

It reopened to pedestrians, cyclists and river traffic in July 2021.

Hammersmith and Fulham Council, which owns the bridge, gave the go-ahead for the £8.8 million stabilisation project last month, saying it did not want to “wait for the Department for Transport (DfT) and TfL (Transport for London) to pay their share”.

As part of this, the pedestals will be filled with concrete, and steel frames will be fitted around them.

The project is due to be completed by the end of the year, after which work to reopen the bridge to motor traffic is expected to take place.

Transport Secretary Grant Shapps said: “Today, I’m giving Londoners reassurance this Government will do everything in its power to keep this vital, historic structure open.

This is an incredibly important day in the long history of Hammersmith Bridge

Roads minister Baroness Vere

“We’re investing millions into its restoration, ensuring local residents can continue to cross the river by foot or bike, and I look forward to working further with the local council on future works to reopen the bridge to motorists.”

Roads minister Baroness Vere said: “This is an incredibly important day in the long history of Hammersmith Bridge.

“Following an enormous amount of work by engineers, Government, the London Borough of Hammersmith and Fulham, and TfL, I can confirm we will be injecting millions of pounds into its restoration, so it stays open to pedestrians, cyclists and river traffic.

“We will not lose momentum. Work is already under way to ensure the structure is reopened to motorists as soon as possible and returned to its former glory.”

TfL confirmed it will also provide a third of the required funding.

Alexandra Batey, TfL’s director of investment delivery planning, said: “We are pleased to be able to support the vital stabilisation works on Hammersmith Bridge alongside the Department for Transport and Hammersmith and Fulham Council.

“We are all working to agree a long-term funding solution that will enable the crossing to open to buses and other vehicles.”

Previous Government funding of £4 million went towards immediate work such as blast cleaning and inspections to ensure there were no long-term risks to the bridge reopening.

The DfT set up the Hammersmith Bridge Taskforce in September 2020 with the aim of bringing together the parties involved to discuss temporary and permanent solutions.

Thank you for registering

Please refresh the page or navigate to another page on the site to be automatically logged inPlease refresh your browser to be logged in