Stay up to date with notifications from The Independent

Notifications can be managed in browser preferences.

Japan's tsunami destroyed any hope for troubled project

A plant meant to make 120 tonnes of Mox a year managed just 13 tonnes in eight years

Steve Connor
Thursday 04 August 2011 00:00 BST
Comments

Your support helps us to tell the story

From reproductive rights to climate change to Big Tech, The Independent is on the ground when the story is developing. Whether it's investigating the financials of Elon Musk's pro-Trump PAC or producing our latest documentary, 'The A Word', which shines a light on the American women fighting for reproductive rights, we know how important it is to parse out the facts from the messaging.

At such a critical moment in US history, we need reporters on the ground. Your donation allows us to keep sending journalists to speak to both sides of the story.

The Independent is trusted by Americans across the entire political spectrum. And unlike many other quality news outlets, we choose not to lock Americans out of our reporting and analysis with paywalls. We believe quality journalism should be available to everyone, paid for by those who can afford it.

Your support makes all the difference.

The final nail in the coffin of the Sellafield Mox Plant was hammered home by the Japanese Prime Minister in May in the aftermath of the crisis at the Fukushima nuclear plant which was inundated by a tsunami shortly after the huge earthquake on 11 March.

Naoto Kan said that he would like to see the closure of another Japanese nuclear plant, at Hamaoka about 200km south-west of Tokyo, because it was built on two geological faults and was not designed for the sort of earthquake that had just devastated his country.

The importance of Hamaoka to Sellafield was that it is operated by Chubu Electric, the only Japanese utility with a definite contract to be supplied with mixed oxide (Mox) fuel from the controversial Sellafield Mox Plant. If Hamaoka were to close, or even be under the threat of closure, the entire rationale for keeping the Sellafield Mox Plant running was yet again called into question.

Even before Fukushima, other Japanese power utilities were looking to see if Sellafield could deliver on the Chubu Electric contract before they too committed themselves to ordering Mox fuel from the Sellafield Mox Plant, which was designed to fabricate 120 tonnes of Mox a year but had managed just over 13 tonnes in eight years.

Fukushima had suddenly, and perhaps irrevocably, changed the nuclear landscape. The international market in Mox fuel, such as it was, collapsed completely, and even before Mr Kan's comments about Hamaoka, shipments of Japanese Mox from France to Japan had been cancelled in the wake of the nuclear crisis unfolding in Japan.

This is why it was inevitable that the Sellafield Mox Plant – perhaps the biggest white elephant in Britain's industrial history – had to close at a total cost to date of about £1.34bn to the British taxpayer.

Join our commenting forum

Join thought-provoking conversations, follow other Independent readers and see their replies

Comments

Thank you for registering

Please refresh the page or navigate to another page on the site to be automatically logged inPlease refresh your browser to be logged in