Stay up to date with notifications from The Independent

Notifications can be managed in browser preferences.

Hydrogen leak delays Discovery's final flight

Ap
Saturday 06 November 2010 01:00 GMT
Comments

Your support helps us to tell the story

From reproductive rights to climate change to Big Tech, The Independent is on the ground when the story is developing. Whether it's investigating the financials of Elon Musk's pro-Trump PAC or producing our latest documentary, 'The A Word', which shines a light on the American women fighting for reproductive rights, we know how important it is to parse out the facts from the messaging.

At such a critical moment in US history, we need reporters on the ground. Your donation allows us to keep sending journalists to speak to both sides of the story.

The Independent is trusted by Americans across the entire political spectrum. And unlike many other quality news outlets, we choose not to lock Americans out of our reporting and analysis with paywalls. We believe quality journalism should be available to everyone, paid for by those who can afford it.

Your support makes all the difference.

A potentially dangerous hydrogen leak occurred as Nasa fuelled Discovery for lift-off yesterday, resulting in yet another delay for the space shuttle's final voyage.

It was the latest, and most serious, problem to befall Nasa's oldest and most travelled shuttle in the past week. The launch has now been postponed until 30 November.

Midway through the fuelling yesterday, flammable hydrogen gas began leaking from the attachment point for a vent line on the external fuel tank. A similar problem delayed two shuttle missions last year.

Managers halted the countdown two hours after fuelling began, and before the six astronauts had boarded the shuttle. Discovery's final mission was already four days late because of technical problems and poor weather conditions.

Allard Beutel, a spokesman for Nasa, said engineeers had hoped the craft would be ready for another lift-off attempt on Monday, but that more time was now needed to fix the leak.

Monday would have been the last opportunity before the end of the month for Nasa to send the shuttle to the International Space Station. After Monday, it would have been in danger of overheating while docking because of the solar angles.

Discovery will carry supplies and a humanoid robot dubbed Robonaut, or R2 – the first to go into orbit.

Join our commenting forum

Join thought-provoking conversations, follow other Independent readers and see their replies

Comments

Thank you for registering

Please refresh the page or navigate to another page on the site to be automatically logged inPlease refresh your browser to be logged in