Stay up to date with notifications from The Independent

Notifications can be managed in browser preferences.

New Berlin airport opening 9 years late with little ceremony

Nine years late and far above its original budget, Berlin’s new airport is finally opening Saturday with little ceremony and, thanks to the coronavirus pandemic, few passengers

Via AP news wire
Saturday 31 October 2020 09:07 GMT
Germany Berlin Airport
Germany Berlin Airport (Copyright 2020 The Associated Press. All rights reserved)

Your support helps us to tell the story

From reproductive rights to climate change to Big Tech, The Independent is on the ground when the story is developing. Whether it's investigating the financials of Elon Musk's pro-Trump PAC or producing our latest documentary, 'The A Word', which shines a light on the American women fighting for reproductive rights, we know how important it is to parse out the facts from the messaging.

At such a critical moment in US history, we need reporters on the ground. Your donation allows us to keep sending journalists to speak to both sides of the story.

The Independent is trusted by Americans across the entire political spectrum. And unlike many other quality news outlets, we choose not to lock Americans out of our reporting and analysis with paywalls. We believe quality journalism should be available to everyone, paid for by those who can afford it.

Your support makes all the difference.

Nine years late and far above its original budget, Berlin's new airport is finally opening Saturday with little ceremony and, thanks to the coronavirus pandemic few passengers.

Construction of the Berlin Brandenburg Airport Willy Brandt, named after the former West German chancellor though better known as BER, started in 2006 and it was initially slated to open in October 2011. But a string of technical and planning problems forced officials to abandon six opening dates — most embarrassingly, in 2012, just four weeks before flights were supposed to start.

That propelled the project to the status of a national joke as airport managers struggled to get a grip on various problems, including a complex fire safety system that long caused headaches.

The airport has cost some 6 billion euros ($7 billion), about three times what was originally planned. It is finally opening at a time when air traffic has been hobbled by the pandemic. The opening of the new airport's Terminal 2 has been delayed until early next year because it isn't currently needed.

BER's opening spells the end of West Berlin s Cold War-era Tegel airport, the busier of the two aging and increasingly cramped airports that so far served the reunited German capital.

Saturday's first landings at the new airport will kick off a week-long transition, with the last flight from Tegel due to depart on Nov. 8. The former East Berlin's Schoenefeld airport, which is located across the runways from BER, is being incorporated into the new airport as its “Terminal 5.”

Tegel and Schoenefeld handled a total 35.6 million passengers last year, putting Berlin in third place in Germany behind the Frankfurt and Munich hubs.

Thank you for registering

Please refresh the page or navigate to another page on the site to be automatically logged inPlease refresh your browser to be logged in