Stay up to date with notifications from The Independent

Notifications can be managed in browser preferences.

Mexico's richest man to rebuild, pay for collapsed subway

Mexico's richest man has pledged to pay for rebuilding a segment of a Mexico City subway line that collapsed on May, killing 26 people

Via AP news wire
Wednesday 30 June 2021 19:47 BST
Mexico Metro Collapse
Mexico Metro Collapse (Copyright 2020 The Associated Press. All rights reserved.)

Your support helps us to tell the story

From reproductive rights to climate change to Big Tech, The Independent is on the ground when the story is developing. Whether it's investigating the financials of Elon Musk's pro-Trump PAC or producing our latest documentary, 'The A Word', which shines a light on the American women fighting for reproductive rights, we know how important it is to parse out the facts from the messaging.

At such a critical moment in US history, we need reporters on the ground. Your donation allows us to keep sending journalists to speak to both sides of the story.

The Independent is trusted by Americans across the entire political spectrum. And unlike many other quality news outlets, we choose not to lock Americans out of our reporting and analysis with paywalls. We believe quality journalism should be available to everyone, paid for by those who can afford it.

Your support makes all the difference.

Mexico’s richest man has pledged to rebuild and pay for a segment of a Mexico City subway line that collapsed on May, killing 26 people, President Andrés Manuel López Obrador said Wednesday.

López Obrador said telecom and construction magnate Carlos Slim has promised to pay for the rebuilding out of his own pocket and have it back in service in a year. One of his companies had originally built much of the section where the collapse occurred.

“He is going to take charge of rebuilding the whole stretch, being careful to ensure it is safe enough, without any cost to the public,” the president said.

“He is going to pay for everything, he promised,” López Obrador said. “He is not going to wait for the legal question (to be resolved), so that it can be back up and working for the benifit of the public again in one year.”

One of Slim’s companies largely built the troubled section of the Line 12 subway. Slim has denied there were construction defects, but a study by an outside certification company cited poor welds in studs that joined steel support beams to a concrete layer supporting the track bed.

The city government hired Norwegian certification firm DNV to study the possible causes of the May 3 accident, in which a span of the elevated line buckled to the ground, dragging down two subway cars.

The report said there were apparently not enough studs, and the concrete poured over them may have been defective; the welds between stretches of steel beams also appear to have been badly done.

The existence of construction defects when the line was built between 2010 and 2012 could be a major blow to Slim and to the political career of Mexico’s top diplomat, Marcelo Ebrard who was mayor at the time.

Another round of studies is to be carried out, and a criminal investigation has not yet resulted in any charges.

For almost a decade, there have been reports that the project was rushed to completion so the Number 12 subway line could be inaugurated by Ebrard, the current foreign relations secretary, before he left office as mayor in 2012.

The collapse was also embarrassing for Slim, currently Mexico’s richest man and once the world’s wealthiest. Slim is an engineer by training and his firms are currently involved in building some parts of the controversial Maya Train project, which will circle the Yucatan Peninsula.

Any suggestions his firm did shoddy work on the subway would be a serious blow to his reputation as a sort of elder statesman of the Mexican business community.

Since the May accident, much of the line has been closed. The elevated portion of the tracks rise about 16 feet (5 meters) above a median strip and roadway in the poor southern borough of Tlahuac. Slender, reinforced concrete columns are topped by horizontal steel beams, which in turn support concrete track beds on which gravel, railway ties and tracks are laid.

Mexico City’s subway, which serves 4.6 million riders every day, has never had the one thing it needs most: money. With ticket prices stuck at 25 cents per ride, one of the lowest rates in the world, the system has never come close to paying its own costs, and depends on massive government subsidies.

Thank you for registering

Please refresh the page or navigate to another page on the site to be automatically logged inPlease refresh your browser to be logged in