Stay up to date with notifications from The Independent

Notifications can be managed in browser preferences.

London's Tower Bridge reopens after being stuck for hours

London’s Tower Bridge has reopened to traffic after the famous crossing was stuck open for hours due to a technical problem

Via AP news wire
Tuesday 10 August 2021 12:29 BST
Britain Tower Bridge
Britain Tower Bridge (Copyright 2021 The Associated Press. All rights reserved)

Your support helps us to tell the story

From reproductive rights to climate change to Big Tech, The Independent is on the ground when the story is developing. Whether it's investigating the financials of Elon Musk's pro-Trump PAC or producing our latest documentary, 'The A Word', which shines a light on the American women fighting for reproductive rights, we know how important it is to parse out the facts from the messaging.

At such a critical moment in US history, we need reporters on the ground. Your donation allows us to keep sending journalists to speak to both sides of the story.

The Independent is trusted by Americans across the entire political spectrum. And unlike many other quality news outlets, we choose not to lock Americans out of our reporting and analysis with paywalls. We believe quality journalism should be available to everyone, paid for by those who can afford it.

Your support makes all the difference.

London’s Tower Bridge has reopened to traffic after the famous crossing became stuck open for hours due to a technical problem.

The City of London Corporation, which owns and runs the bridge, said Monday that the bridge was “stuck in a raised position” due to a technical issue. Roads around the bridge, one of the main crossings of the River Thames in central London, were closed Monday afternoon and evening to vehicles and pedestrians.

Traffic returned to normal in the early hours of Tuesday after the crossing reopened.

The bridge, one of London’s most recognized landmarks, was built by the Victorians more than a century ago and first opened in 1894. It was designed to open to allow the many large cargo ships carrying goods such as sugar and tea to pass through. The bridge now lifts around 800 times a year, or around twice a day.

It was previously closed in August last year when a mechanical fault meant it was stuck for more than an hour.

Thank you for registering

Please refresh the page or navigate to another page on the site to be automatically logged inPlease refresh your browser to be logged in