Stay up to date with notifications from The Independent

Notifications can be managed in browser preferences.

Cooling system fails at Fukushima nuclear plant for second time in a month

 

Ap
Friday 05 April 2013 10:10 BST
Comments
The Unit 4 reactor at the crippled Fukushima plant
The Unit 4 reactor at the crippled Fukushima plant (AP)

Your support helps us to tell the story

From reproductive rights to climate change to Big Tech, The Independent is on the ground when the story is developing. Whether it's investigating the financials of Elon Musk's pro-Trump PAC or producing our latest documentary, 'The A Word', which shines a light on the American women fighting for reproductive rights, we know how important it is to parse out the facts from the messaging.

At such a critical moment in US history, we need reporters on the ground. Your donation allows us to keep sending journalists to speak to both sides of the story.

The Independent is trusted by Americans across the entire political spectrum. And unlike many other quality news outlets, we choose not to lock Americans out of our reporting and analysis with paywalls. We believe quality journalism should be available to everyone, paid for by those who can afford it.

Your support makes all the difference.

The cooling system for a storage pool for fuel at one of the reactors at the tsunami-damaged Fukushima nuclear plant in Japan failed today for the second time in a month, although there was no immediate danger from the breakdown.

Nuclear Regulation Authority spokesman Takahiro Sakuma said an alarm went off in the afternoon about the problem at reactor No. 3. The cause was still under investigation.

The cooling system can be turned off for two weeks before temperatures approach dangerous levels at the spent fuel storage pools, according to the Tokyo Electric Power Company, or TEPCO, the utility that runs Fukushima Dai-ichi in northeastern Japan.

But if the water runs dry, the fuel rods, even spent ones, will emit enormous levels of radiation.

The plant went into multiple meltdowns after the March 2011 tsunami damaged backup generators and all cooling systems failed, including those for the reactors. The plant is being decommissioned, but continues to have glitches.

Last month, a power outage led to a cooling system not working for two days, and TEPCO later said it had found a dead rat near a switchboard and suspected that was the cause for the power going out at nine facilities at Fukushima Dai-ichi.

Fears are growing about the safety of nuclear plants, and people have periodically staged street protests that are rare in Japan.

Only two of the nation's 50 working power plants are up, and the government is running beefed up safety checks on the plants, including scrutinising quake faults right below or near the plants.

Shinzo Abe, who became prime minister about three months ago, has expressed a desire to restart nuclear plants. Japan lacks natural resources and relied on nuclear energy for about a third of its electricity needs prior to March 2011. Energy imports have soared over the last two years, putting a strain on the economy.

Join our commenting forum

Join thought-provoking conversations, follow other Independent readers and see their replies

Comments

Thank you for registering

Please refresh the page or navigate to another page on the site to be automatically logged inPlease refresh your browser to be logged in