Stay up to date with notifications from The Independent

Notifications can be managed in browser preferences.

Sellafield nuclear site 'given the all clear'

Part of the site had been shut off after above-normal reading

Heather Saul
Friday 31 January 2014 09:55 GMT
Comments

Your support helps us to tell the story

From reproductive rights to climate change to Big Tech, The Independent is on the ground when the story is developing. Whether it's investigating the financials of Elon Musk's pro-Trump PAC or producing our latest documentary, 'The A Word', which shines a light on the American women fighting for reproductive rights, we know how important it is to parse out the facts from the messaging.

At such a critical moment in US history, we need reporters on the ground. Your donation allows us to keep sending journalists to speak to both sides of the story.

The Independent is trusted by Americans across the entire political spectrum. And unlike many other quality news outlets, we choose not to lock Americans out of our reporting and analysis with paywalls. We believe quality journalism should be available to everyone, paid for by those who can afford it.

Your support makes all the difference.

The Sellafield nuclear site in Cumbria has been given the all-clear after it was shut to all but essential staff following reports of the detection of elevated levels of radioactivity.

Its operator, Sellafield Ltd, had said the site would be run at "reduced manning levels today" after radioactivity readings reached levels above those that occur naturally.

But following an analysis by safety staff, Sellafield said the levels were "naturally occurring background radon".

The company is still trying to establish exactly why the alarm was sounded.

In a statement it said: "Sellafield Ltd can confirm that the radioactivity detected by one of our in-air monitors overnight is not attributable to any issue or problem with any of our operations on site.

"Our in-air monitors are extremely sensitive and pick up on any abnormality. Overnight the monitoring system initially indicated elevated levels of activity. Following investigation and analysis, we can now confirm these levels to be naturally occurring background radon.

"The No 1 priority for us is, at all times, safe secure stewardship of the Sellafield site, which is the most complex and challenging nuclear site in Europe.

"As such, we act in a safety-conscious manner, and take cautious, conservative decisions, such as the one taken overnight to ask non-safety-essential staff to stay at home this morning, rather than come to the site.

"All of our plants and storage facilities were quickly confirmed as operating normally, and we were always confident that the issue posed no risk to the workforce or public because the levels being detected, whilst above background radiation levels, were still low.

"This view was reinforced by the fact that none of our other installed monitors were picking up any kind of increased levels. However, we take such issues so seriously that we investigated fully to confirm that everything was OK.

The Department of Energy and Climate Change has stressed there is currently no risk to the public or workforce.

"Standard weekend working operations will continue, with day staff due back in on Monday as normal.

"We would like to thank our staff and the wider West Cumbrian community for their calm and mature response to events this morning."

Prospect, which represents 5,000 nuclear specialists at Sellafield, said the elevated radiation readings were within acceptable limits and were not a danger to human health or to the plant.

Join our commenting forum

Join thought-provoking conversations, follow other Independent readers and see their replies

Comments

Thank you for registering

Please refresh the page or navigate to another page on the site to be automatically logged inPlease refresh your browser to be logged in