London Bridge station crush condemned as 'completely unacceptable' and 'life-threatening' as Network Rail orders review
Passengers jumped barriers amid chaos at the busy station
Your support helps us to tell the story
This election is still a dead heat, according to most polls. In a fight with such wafer-thin margins, we need reporters on the ground talking to the people Trump and Harris are courting. Your support allows us to keep sending journalists to the story.
The Independent is trusted by 27 million Americans from across the entire political spectrum every month. Unlike many other quality news outlets, we choose not to lock you out of our reporting and analysis with paywalls. But quality journalism must still be paid for.
Help us keep bring these critical stories to light. Your support makes all the difference.
Network Rail has said it will review its plans during development of the Thameslink programme at London Bridge after a short closure last night caused “life-threatening chaos” for rush hour commuters.
Lines were shut down for 45 minutes from 4.20pm because of a person on the tracks at Streatham, the operator said. The knock-on delays saw huge numbers of people stranded on platforms and some forced to jump closed barriers to avoid the crush, while onlookers posted dramatic images online.
The London Mayor, Boris Johnson, said: “This chaos must end now. The scenes at London Bridge last night were completely unacceptable.
“It is a disgrace that Network Rail and the train operating companies have failed once again to get a grip of the situation at London Bridge.
Mick Cash, leader of the Rail, Maritime and Transport union said last night's scenes were “horrific”, adding: “RMT is sick and tired of the excuses about the continuing chaos at London Bridge which led to horrific scenes at the station last night.
“The fragmentation and privatisation of our railways leaves train companies and Network Rail blaming each other while passengers and staff are left caught in the kind of life threatening chaos we have seen in pictures from one of London's major rail terminals last night.”
Network Rail's route managing director for the South East, Dave Ward, described the situation for commuters last night as “very tough”.
“We will as a matter of course be reviewing our plans and the events of last night to see what, if any, lessons can be learned,” he said.
“The railway around south London is so busy that if one train is delayed by just one minute it will delay 17 other services as a result,” he said. That is why the Thameslink programme is so important to the future of our railway.”
Labour said there needed to be a “very frank discussion” with rail bosses about why rail services have been “consistently underperforming” while passengers are charged “extortionate” fares.
A Conservative Party spokesman said: “For the thousands of commuters whose journeys home were disrupted, last night's events were unacceptable. While the cause of delays was beyond anyone's control, it is clear the crowd management at the station failed.
”Network Rail and the operators know this and must ensure they make the necessary changes to give passengers a robust service and to ensure these scenes are not repeated.“
Subscribe to Independent Premium to bookmark this article
Want to bookmark your favourite articles and stories to read or reference later? Start your Independent Premium subscription today.
Join our commenting forum
Join thought-provoking conversations, follow other Independent readers and see their replies
Comments