Stay up to date with notifications from The Independent

Notifications can be managed in browser preferences.

It is ‘obvious’ HS2 should extend into Euston, says rail minister

Lord Hendy of Richmond Hill was speaking as he revealed two new tunnel boring machines.

Jordana Seal
Monday 02 December 2024 15:34 GMT
In the Budget, Chancellor Rachel Reeves announced the Government would be ‘committing the funding required’ to begin the tunnelling work (Jonathan Brady/PA)
In the Budget, Chancellor Rachel Reeves announced the Government would be ‘committing the funding required’ to begin the tunnelling work (Jonathan Brady/PA) (PA Wire)

Your support helps us to tell the story

From reproductive rights to climate change to Big Tech, The Independent is on the ground when the story is developing. Whether it's investigating the financials of Elon Musk's pro-Trump PAC or producing our latest documentary, 'The A Word', which shines a light on the American women fighting for reproductive rights, we know how important it is to parse out the facts from the messaging.

At such a critical moment in US history, we need reporters on the ground. Your donation allows us to keep sending journalists to speak to both sides of the story.

The Independent is trusted by Americans across the entire political spectrum. And unlike many other quality news outlets, we choose not to lock Americans out of our reporting and analysis with paywalls. We believe quality journalism should be available to everyone, paid for by those who can afford it.

Your support makes all the difference.

Extending HS2 into central London is “obvious”, the rail minister said as two new tunnelling machines were unveiled.

Lord Hendy of Richmond Hill said the long-running project needed to get on to a “stable footing” as he revealed the two new tunnel boring machines (TBMs) which will build the pair of 4.5-mile tunnels from Old Oak Common station to Euston station.

In the Budget, Chancellor Rachel Reeves announced the Government would be “committing the funding required” to begin the tunnelling work, which would start from 2026.

It came after the previous Conservative government said the extension was reliant on private investment, in a bid to save £6.5 billion of taxpayers’ money, and the Government’s infrastructure tsar warned the “real challenge” was developing Euston station.

Major HS2 construction work at a site alongside the existing station has been halted since March 2023 due to funding doubts.

On Monday, the rail minister said: “The last government left this project with the railway finishing at Old Oak Common, well outside the centre of London, with everybody at least in theory having to change to go into central London.

“It’s obvious that a new high-speed railway across England should get into Euston.

“It’s not surprising that people are worried about the project. Suddenly the previous prime minister announced it would be curtailed.”

It will take 18 months for the TBMs to dig the final 4.5 miles of underground railway, with the machines operating 24 hours a day.

In the past six months, two launch chambers have been built to facilitate the 190-metre-long TBMs.

The machines were built by specialists in Germany, taken apart, and then reassembled by engineers at the Old Oak Common site.

The 1,250 tonne machines have been named after prominent women in history.

The first is named Karen after Karen Harrison, the first female train driver in the UK, who was based out of Old Oak Common depot.

The second is Madeleine, after Madeleine Nobbs, the former president of the Women’s Engineering Society.

Monday also marked the first day of new chief executive Mark Wild, who is tasked with overseeing HS2’s transition from a construction programme to a working railway.

Lord Hendy added: “I think we’ve got to get it (HS2) back on a stable footing that’s what Mark Wild is going to do.

“He’s going to work out how long it’s going take, how much it’s going to cost and when it opens, and I’ll believe him and so should everyone else when he’s done it.”

Huw Edwards, stations delivery director for HS2 Ltd, said: “2025 is going to be the year for HS2. We’ve had a series of issues in the past, a loss of political support, the change of government gave a level of instability.

“But for me what we’re seeing now is a different HS2 organisation than we were a year ago, we’ve got a much leaner organisation.”

Thank you for registering

Please refresh the page or navigate to another page on the site to be automatically logged inPlease refresh your browser to be logged in